Total Pageviews

మీకు కావలసిన ఫారముల కొరకు "FORMS: క్లిక్" చేయండి.

GDS WELFARE FORMS

Wednesday, 8 June 2016

Memorandum on CBS / McCamish was submitted to SSPOs, Ongole on 0806-2016

Copy of the memorandum ;


ALL INDIA POSTAL EMPLOYEES UNION- Group-C
Prakasam Dn., Ongole – 523 001
To,                                                                                                    Dtd. 08-06-16
The Sr. Supdt. Of Post offices,
Prakasam Dn., Ongole – 523 001

Sir,
          We wish it to bring the miseries of the staff in dealing with McCamish (PLI/RPLI) and CBS (Finacle).
          It came to know that the department is happy from officer level to ministerial level, at the speedy transformation of our department into online connectivity in regard to PLI , RPLI and banking solutions. But in prevailing situation the things are very much different. In majority of the operative offices there will not be electricity power for major part of work hours. If at all there is Ele. Power supply there may be deficiency in connectivity with online servers. There is no good and adequate knowledge to the staff in dealing with the online operations. If all of these are working and well connected, there will be problems with printers and non availability of stationery. After all, there will be a final problem of COD (Close of the day procedure). If this is delayed, the staff are forced to sit hours together for ending of the day and even in some cases staff are forced  to go to nearest office where the electricity and connectivity is all doing well. Like this there are countless problems every where.
Apart from all the above some other problems are narrated here under for favor of kind information;

McCamish Issues:-
1.    For many policies, earlier premium approved differs with the rate of premium available online and it has become a major problem in dealing with the customers.
2.    Many policies appear in system admin queue even after disbursement is paid as there is no power to system admin then why there is system admin queue and for each such case CPC have to raise the ticket.
3.     There is no provision to view the reports of BO’s of HO’s in McCamish due to which HO’s are unable to tally the BO summary with Mccamish. Some procedure naming “Push back” amount has been introduced by suggesting per contra UCP sanctions from divisional head. But no fool proof checking is designed at any level. By this staff at HO / DO level will be in danger of delinquencies in excess sanctions.
4.     No deployment of posts have been done from the administrative offices to CPC’s whereas all the work relating to Insurance have been delegated to operative office. All CPC’s are working without establishment sanctions and adequate staff is also not deployed at CPC’s.
5.     Issues for which tickets are raised are not resolved at earliest, sometimes issues are resolved after 20 days. Facing the customers has become a un bearable problem. The staff are forced to indulge in unwanted arguments with the policy holders.
6.     There are good number of APS policies which are not migrated to mcCamish software.
7.     Out of 30 days of month reports are not accessible in almost 10- 15 days at evening when the offices have tally their accounts. Sometimes offices have to kept the money out of account and tally the accounts on next day.
8.     The McCamish receipt printing is not adjusted to the stationery supplied. The perforation designed not suites with the stationery supplied for printing the customer receipt.

Networking Issues

1.     The contract have been assigned to sify technologies for providing NSP-1 and NSP-2. The service provider for primary link i.e. NSP-1 is BSNL and Whenever NSP-1 get down in 80% offices network does not get on to NSP-2 automatically. The finacle is not accessible in NSP-2 and as far as the quality of NSP-2 is concerned, it overall results comes to be unfruitful. The expenditure which the department of posts is spending on NSP-2(dongle based) is all in vein. No outcome for good network is shown even after up gradation of bandwidth in class D and E Post Office. Whenever the ticket for non working of NSP-1 is raised the only reply from Sify side is that the problem is at the end of BSNL and no settlement is made till the BSNL restores its network. Offices are having their work held up for more than 10 days and in some instances for more than a fortnight. The higher offices forces the operative staff to clear their pending work in nearby feasible location which is not a proper way at all.
2.     There is only one Circle Coordinator of Sify followed by one service engineer for 2 postal division. It is not practically possible for this crew to rectify the major fault when fault persists in more than one location simultaneously. On the other side officials from Sify/Infosys/TCS used to direct the System Administrators to resolve the networking issue/other issues in Post Offices. And Our department denies to give a special grade to System Administrators.

Finacle
1.     The main base for the non-accessibility of the Finacle server, is either with the Main server capacity or the programming done by the Infosys. Bandwidth alone is not the reason for the slowness in Finacle. So,server as in Railways has to be installed. If necessary post offices across the country may be divided into four zones and one server for each zone with inter accessibility may be installed. The bandwidth for single handed and other S.Os should be increased. To overcome the existing problem additional servers shall be provided to bear the load.
2.     From the date of migration, the Finacle server is not running promptly and takes very much time in processing even a single transaction.
3.     Agent portal is not working from last 10 days and not services of this portal is not resumed till date.
4.     Variety of services in Finacle Server found to be inaccessible on routine basis. Whenever one error rectified, another appears in a consecutive manner.
5.     Finacle works on the principle of maker and checker, but in single hand offices where only one official works, this concept of maker and checker not seems to be logical. Either the concept of maker and checker should be scrapped or the concept of single hand offices should be abolished. All single hand SO’s should be upgraded to Double Hand SO’s.
6.     Whenever the deposits for SSA, SB and PPF is made, the trans-id directly enters into posted stage and no modification/deletion is possible in this stage. In the later stage supervisor finds any mistake during verification, the only way to get rid is the verification of that particular trans-id. For this the only solution is that the deposit made by counter clerk firstly have to enter in the entered stage which allows the rectification of any kind of mistake.
7.     DMCC is pressurizing to execute EOD on 2000 hours daily. And after this they are not providing any support to the staff who is working late hours in the night. Workload of transactions is that much that it is not possible to finish the work well before 2000 hours.
8.
i.      In SSA, total deposit in a Financial year should not exceed Rs.1,50,000/- but there is no provision to stop any excess deposit in any single account. The official as well as the public suffers due to excess deposit in SSA account. Mechanism to disallow any excess deposit above the limit should be provided.
ii.      For Cash Certificates, either the present system of Certificates with specified denomination has to be dispensed with as in banks for Fixed Deposit or Higher denomination up to Rs.100000/- to be introduced for all Post Offices as printing of cash certificates consumes much time.
iii.    The supervisors should be given option to reconcile the errors committed by the clerks at counter while making deposit entry with reverse option as in PPF deposits.
iv.   In RD accounts Pre Mature closure is not allowed if any advance deposits is made, till the lapse of the period up to which advance deposits has been made by the depositor. It denies the right of the depositor to close the account prematurely. Provision may be made to close the accounts with advance deposits with provision to recover the rebate given for the advance deposits.
v.    There is no difference between PLI AND RPLI policy  numbers as far as new accepted policies concerned, so as to get the print outs in the relevant PD DOCUMENT.
vi.   Similar in case of AEA, GY, CHILDREN POLICIES; WLA; CWLA etc.. where in NIC it can be differentiated.
vii.  While indexing  new RPLI proposals at  Counters, collection head is defaultedly set as PLI , and it is very difficult to refund the same if it is wrongly generated as PLI since for the said type of work, as usual, (i) FOLDER IS TO BE CREATED(ii) ECMS work is to be completed (iii) DATA ENTRY WORK IS TO BE DONE by giving irrelevant information   -    then only the same can be rejected at QUALITY CHECKER STAGE and it takes minimum 10 days to refund the amount.
viii. In most of the days, though entry has been made in DATA ENTRY and submitted properly, the status of the said policy/proposal will show as “ DATAENTRY RESERVED” ONLY.
ix.   If the address of the insurant is to be changed, letter only is generated but the same could not be viewed in policy document which is very essential.
x.    Instructions have been issued to scan old PLI /RPLI documents for digitization with time frame.  High speed scanners are not available and it is not possible to scan with the existing scanner.
xi.   The out most requirement is adequate training to the staff. But in Prakasam Dn., the work place training center is having following deficiencies;
a.     No inter connectivity ( Server ) for explaining the software properly at Chirala WPTC.
b.    The Air conditioner provided is not functioning for a longer period.
c.     Training material is not supplied.

Other Issues: -
1.     Shortage of Staff: - There is no recruitment from last three years and the situation is that all triple hand SO’s are functioning with two official and like-wise double hand SO’s are working with only one official. In case of LSG promotions when PA refused to accept the said promotion the post becomes vacant but the work is maintained by some other PA, resulting into more burden on PA. Therefore, it is suggested that the vacant posts of LSG may be included in the recruitment of PA’s. Same situation is noticed in case of LR Posts all are lying vacant.
2.     Introduction of new branches: -    More number of branches have been introduced in the recent year. For example CPC(PLI/RPLI) have been created at HO level, CPC(CBS) have been created at Circle Level. But there is no provision in the establishment for the said branches. The staff for the functioning of these CPC’s have been brought from other operative offices which suffers smooth working of those offices. For example 7+ officials are named as system administrators. Three persons at DO level and one to three persons at HO level are kept under PLI / RPLI work. All these are further supported by out sourcing personal. It shows that there is ever need to augment the present staff strength which is not taken up so far. Due to this diversion, the operative side are suffering shortage , which causing the deficiency in work aspect. This is forcing delinquencies and forced recoveries from the staff in the name of pecuniary losses at the fault of inability of the administration in meeting the staff demand.
3.     Infrastructure Problem: -   On the one side department is transforming into a new CBS environment, and on other side infrastructure situation is very bad for example UPS and Genset of most of the offices are lying out of order and furniture is not in adequate position. Our department is spending crores of rupees on these private companies and harassing own staff up to a great extent.
4.     Change of incumbency :-  When there is some change of incumbency owing to leave / deputations / change of duties , there is a problem of activation of use ID for particular office. Due to which the deficiency in customer services is inevitable. In some cases the user ID other official are being used with default passwords. In some cases , the charge relinquishing official is being forced to reveal the password to assuming official, which is not correct. For instance , the ID and default password of an official at Ongole HO has been tried and erroneously the ID and password relating to the official in Keral has utilized for Ongole HO. The official in charge who was going on leave at Kandukur south office had been forced to give her ID and password to the new incumbent. In throvagunta , the present incumbent is not provided with ID & password due to which even the GDS official couldn’t withdraw their salaries form their SB accounts even after completion of one month.
5.     Further more, deputing any official for leave vacancies of Sub offices has become a bigger problem. Because of Finacle / McCamish problems the staff who are on leave are not entrusted to rejoin their duties. The staff who are deputed are facing heavy problem in dealing with local customers. Adding to this , almost 10 C-class offices are vacant and running on deputations. No staff for leave reserve is deployed. There is a need for immediate recruitment at least to the present sanctioned strength level , along with leave reserve.



6.     In many cases , the data given to the Finacle server was fed by outsourcing staff at at the oral approval from ASP(R) % SSPOs ,for which the wages for the said outsourced personal are not sanctioned for months together. The immediate friction of outsourcing staff with the local SPM has become unavoidable. But every enthusiasm was shown in clearing the bills of Out sourcing Organizations leaving individual engagements un attended and Computer rents are also sanctioned at a high speed.
7.     The infrastructure ie. Printers: Almost all SOs are supplied with the color laser printers. But most of the printers supplied are not accommodating the local preinter refilling. The only remedy is , indenting the toner from the manufacturer, which is not feasible in most of the cases. Where such printers are supplied , the said office will not be provided with an other printer, since it is already supplied with lazer zet , which will be kept idle for want of supply from the manufacturer. This is nothing but non availability of printer. Without printer , the SPM can not submit due reports to HO /DO , which may lead to delinquency in services.
8.     Correctness of the data: As it is known that the data in respect of SOs was fed with by the outsourcing units directly. No efforts are made for prior feeding the same into “Sanchaya”. Even the data given to Finacle is not checked at various levels. The entire burden was thrown on the SPMs. In no case the Sub divisional head has verified the data for completing the verification certification.

The above are only the important items which shall be attended as if fire on the top roof. We are expecting immediate and swift action from the divisional  administration to take necessary steps for bringing  the Postal work into normalcy. In the event of no improvement, this Divisional Union will have no other option to follow the calls of Circle and Central head quarter union for the following program of action.

1.     Gate meeting protests at Divisional level on 10-06-2016.
2.    10th to 14th , June-2016 : Post card campaign
3.      16th June-2016 : Dharna at Circle office
4.    17th & 18th June-2016 : Protest Black badges
5.      30th June-2016 : Protest in front of Directorate , New Delhi.

We hope every effort will be made to restore normalcy in postal operations at the earliest to save the image of the department as well as to minimize the problems of working staff.

                                    Thanking you Sir,
                                                                                                       Yours faithfully,


                                                                                                (K.VENKATESWARLU)
                                                                                                  Divisional Secretary

Copy to:
The Circle Secretary, AIPEU , Gr-C , AP Circle , Hyderabad
For information.














No comments:

Post a Comment